Return
BASHAS' RESTROOM RESTORATION PROGRAM
Store No.:
Number of
Restrooms:
Number of
Technicians:
Technician
Time In:
Technician
Time Out:
Entry:
Hall or alcove to restrooms painted to match décor
Wainscot or trim cleaned and sealed
Drinking fountains cleaned, polished and siliconed or caulked
Base painted or new cove base installed
Walls:
Drywall repaired
Drywall painted
All fixtures secured or if to be replaced Bashas' to supply new
Cove base cleaned or replaced
Air freshener changed or replaced
Format (Bashas', AJ's, Food Citys) Cleanliness Matters Sign Posted
Dispensers replace if needed:
Hand Soap
#
Toilet Paper
#
Paper Towel
#
Seat Protector
#
Floor:
VCT-repair or replace
Repaired epoxy paint (with new one coat system)
Partitions:
Tighten or secure panels
Repair or replace hardware
Patch or repair
Sand and paint
All grafitti cleaned or painted over
Ceiling:
Cleaned or painted
Vent cleaned and painted
Light lens cleaned or replaced
Exhaust fan repaired and cleaned
Toilets:
Sanitized with bleach tablet
Silicone or caulked
Misc. adjustments
Counters & Sinks:
Cleaned and sanitized
Misc. minor repairs and adjustments
Caulked or siliconed
Hand wash sign posted
IF A FOLLOW-UP IS NEEDED, ENTER THE FOLLOW-UP DATE:
VENDOR
BASHAS'
Vendor
Comments
Store
Follow-Thru
Store
Comments
Store Director please create a Verisae/Corrigo Work Order for any replacement items.
Submit
Are you sure you want to
DELETE this Form?
Yes
Cancel